PRODUCTION FACILITIES

ISTANBUL EUROPEAN SIDE AYAZAGA SITE
Capacity of Hot Mixtures with Bitumen: 1,000 Tons/H
Capacity of Modified Asphalt: 220 Tons/H
Capacity Of The Emulsion Facility: 10 Tons/H
Capacity Of Mechanical Stabilization: 450 Tons/H

ISTANBUL ANATOLIAN SIDE ORHANLI SITE
Capacity of Hot Mixtures with Bitumen: 400 Tons/H